Work Begins to Extend the Hazel McCallion Line Into Downtown Brampton

· ·
Hazel McCallion Line construction on a road in Peel Region

Light rail is one step closer to downtown Brampton. The Ontario government has started early work to extend the Hazel McCallion Line north into the heart of the city. Crews are now drilling test holes along Main Street to learn more about the ground below.

The province shared the news on November 9. The extension would make it easier for people in Brampton to reach jobs, school and shopping in Mississauga, and to connect with GO trains in downtown Brampton.

Where the Extension Will Go

The new section will run more than three kilometres. It will start at the Brampton Gateway Terminal at Steeles Avenue East and end at the Brampton Innovation District GO Station downtown.

Right now, the main Hazel McCallion Line has 19 stops over 18 kilometres, linking Brampton and Mississauga along Hurontario Street. Light rail vehicles are being tested on that main line.

Key Details

  • What: Extension of the Hazel McCallion Line light rail into downtown Brampton
  • Route: Brampton Gateway Terminal to Brampton Innovation District GO Station
  • Length: More than 3 kilometres
  • Work now: Test drilling along Main Street and nearby streets
  • Next steps: Planning and design
  • Opening date: Not announced yet

What Officials Are Saying

“People in Brampton deserve a transit system that keeps pace with their growing city,” said Prabmeet Sarkaria, Ontario’s Minister of Transportation, in the province’s announcement.

Metrolinx says the drilling will help it choose the right tools and building methods. “This work will give us a better understanding of soil conditions,” said Michael Lindsay, president and CEO of Metrolinx.

Lindsay also said the work may cause some trouble for people nearby. “We know that this work can be disruptive to local businesses and communities,” he said.

Brampton Mayor Patrick Brown said he wants the project to keep moving and urged the province to “move quickly from design to construction.”

Part of a Bigger Transit Plan

The extension is part of Ontario’s plan to spend nearly $70 billion on public transit. A separate project would also extend the line into downtown Mississauga.

Local members of the provincial legislature say the project will help both cities. “Bringing rapid transit into downtown Brampton means better connections to jobs,” said Hardeep Grewal, Member of Provincial Parliament (MPP) for Brampton East.

Nina Tangri, MPP for Mississauga–Streetsville, called it “an important step” for the region.

What It Means for Riders

  • Easier links to Brampton Transit and Züm buses.
  • A direct light rail trip from downtown Brampton to Mississauga.
  • A connection to GO trains at the Brampton Innovation District station.
  • More foot traffic for shops and restaurants downtown.

What Happens Next

The test drilling is only the first step. After this, Metrolinx will move on to planning and design. The province has not shared a cost or a completion date for the extension yet. If you live or work near Main Street in Brampton, expect some crews and some disruption while the drilling work goes on.

References

You Might Also Like…

Read More..

Leave a Reply

Your email address will not be published. Required fields are marked *